University of Calgary Faculty of Law ABLawg.ca logo over mountains

Category: Environmental Page 28 of 53

Provincial Environmental Appeal Boards: A Forum of Choice for Environmental (and First Nation) Plaintiffs?

By: Nigel Bankes

PDF Version: Provincial Environmental Appeal Boards: A Forum of Choice for Environmental (and First Nation) Plaintiffs?

Decision Commented On: Chief Gale and the Fort Nelson First Nation v Assistant Regional Water Manager & Nexen Inc et al, Decision No. 2012-WAT-013(c), BC Environmental Appeal Board, September 3, 2015

In this important (and lengthy) decision (115pp), British Columbia’s Environmental Appeal Board (EAB) revoked Nexen’s commercial water licence for two reasons: first, the terms and conditions of Nexen’s licence were not technically supportable, and second, the Crown was in breach of its constitutional obligation to consult the First Nation with respect to the decision to issue the water licence.

I think that the decision is important for at least four reasons (notwithstanding the fact that the days for the version of the Water Act, RSBC 1996, c 483 in force at the time of this licence decision are numbered since it is due to be replaced by the new BC Water Sustainability Act in early 2016 and for comment see here). First, and most generally, it is an excellent example of the important role that environmental appeal boards can play in shining a light on the administrative practices of line departments. In the same vein, it is also offers a dramatic illustration of the differences between the role of an EAB and the role of a court on a judicial review or statutory appeal application. An EAB can offer a searching, de novo, technical re-assessment of the merits of the department’s decision; a court is inevitably more deferential and precluded from engaging in an assessment of the merits. I have written at length on this important role that EABs serve, see “Shining a light on the management of water resources: the role of an environmental appeal board” (2006), 16 Journal of Environmental Law and Practice 131 – 185.

5 Things I learned about Mike Duffy Canada’s New Fish Habitat Protection Laws

By: Martin Olszynski

PDF Version: 5 Things I learned about Canada’s New Fish Habitat Protection Laws

Case Commented On: Section 35 of the Fisheries Act, RSC 1985 c F-14, as amended by the Jobs, Growth and Long-term Prosperity Act, SC 2012, c 19

This is a follow-up post to an earlier blog from May in which Alex Grigg and I described a research project looking into the new “fisheries protection” regime under the amended Fisheries Act. Interested readers are referred to that post for background. Briefly, in order to gain insight into the difference between the previous habitat protection regime and the new fisheries protection regime, we analyzed the primary permitting vehicle in this context, the Fisheries Act section 35 authorization (previously authorizing harmful alteration, disruption or destruction of fish habitat, now authorizing the death of fish and the permanent alteration or destruction of fish habitat). One hundred and eighty four authorizations (just over 1600 pages worth) issued by the Department of Fisheries and Oceans’ two largest regions (Pacific and Central & Arctic) over a six-month period for the years 2012, 2013, and 2014 were analyzed, with 2014 being the first year under the new regime. In order to help frame the analysis and provide additional baseline information, twelve statutorily required annual reports to Parliament on the administration and enforcement of the habitat/fisheries protection provisions were also analyzed (2001/02 – 2013/14). In this post, I discuss five of the most significant findings from this analysis. The full paper (from which this post borrows liberally) is available here.

Implementing the New Liability and Financial Assurance Rules for Oil and Gas Operations on Federal Lands in the Arctic and for the East Coast Offshore

By: Nigel Bankes

PDF Version: Implementing the New Liability and Financial Assurance Rules for Oil and Gas Operations on Federal Lands in the Arctic and for the East Coast Offshore

Regulations Commented On: [Draft] Canada Oil and Gas Operations Financial Requirements Regulations and accompanying Regulatory Impact Assessment Statement (RIAS), Canada Gazette, vol. 149, No. 28, July 11, 2015, [Draft] Canada-Newfoundland and Labrador Petroleum Financial Requirements Regulations, Canada Gazette, vol. 149, No. 28, July 11, 2015 and [Draft] Canada-Nova Scotia Petroleum Financial Requirements Regulations, Canada Gazette, vol. 149, No. 28, July 11, 2015

The current liability and assurance rules for oil and gas operations on federal lands and for the east coast offshore are, by any account, outdated and inadequate. The federal government undertook to review these rules following the Montara and Macondo spills and the National Energy Board (NEB) undertook its own review, The Past is Always Present: Review of Offshore Drilling in the Canadian Arctic, Preparing for the Future (2011). As a result of these initiatives the government introduced Bill C-22 which became the Energy Safety and Security Act, SC 2015 c.4 (ESSA). ESSA obtained Royal Assent on February 26, 2015 but will not (s.119) enter into force until 12 months after Assent or on an earlier date prescribed by Order in Council. The delay permits the development of the necessary regulations, including the three related regulations (supported by a common RIAS), that are the subject of this post. Bill C-22 once in force will, inter alia amend the liability and financial assurance provisions of the Canada Oil and Gas Operations Act, RSC 1985, c. O-7 (COGOA), the Canada-Newfoundland and Labrador Atlantic Accord Implementation Act, SC 1987, c.3 and the Canada-Nova Scotia Offshore Petroleum Resources Accord Implementation Act, SC 1988, c.28. This post will focus on the COGOA rules although what is said here for the most part applies equally to the areas covered by the Accord Acts. The first part summarizes the current COGOA provisions. The second part summarizes the changes that ESSA makes to COGOA. The third part discusses the regulations and the accompanying RIAS. The fourth part offers some comments on the regulations while the final part asks what is missing from this regime.

The SGER Amendments and the New Treatment of Cogeneration

By: Nigel Bankes

PDF Version: The SGER Amendments and the New Treatment of Cogeneration

Regulation Commented On: Specified Gas Emitters Amendment Regulation, Alta Reg 104/2015

In a previous post I reported on the Minister’s speech announcing a two-step procedure for developing a new climate change policy for Alberta. The first step involved changes to two of the key variables in the current Specified Gas Emitter Regulation (SGER), Alta Reg 139/2007 while the second step is the more comprehensive review to be conducted by Dr Andrew Leach to assess the full range of options for the management of greenhouse gas emissions in the province. At the time I wrote that post I had not examined the details of the amendments to the SGER to see what other changes (if any) were being proposed. This post picks up where the last left off.

Supreme Court: EPA Should Have Considered Cost When Deciding Whether Mercury Limits for Power Plants Were Appropriate

By: James Coleman

PDF Version: Supreme Court: EPA Should Have Considered Cost When Deciding Whether Mercury Limits for Power Plants Were Appropriate

Case Commented On: United States Supreme Court, Michigan v United States Environmental Protection Agency (June 29, 2015)

On Monday the United States Supreme Court held that the Environmental Protection Agency (EPA) improperly refused to consider costs when determining whether it was “appropriate and necessary” to regulate mercury emissions from power plants under the Clean Air Act. Ultimately, the EPA may be able to keep the same rules after going back and explaining why the cost of the regulations is justified in the circumstances. But the decision is an important victory for advocates of cost-benefit analysis and those who think environmental agencies should pay more attention to the costs of regulation.

Section 112 of the Clean Air Act directs the EPA to regulate hazardous air pollutants from power plants if it finds “regulation is appropriate and necessary” 42 U.S.C. §7412. The EPA said that regulation was “appropriate and necessary” even without considering costs because 1) power plant emissions posed risks to human health and the environment that were not eliminated by other provisions of the Clean Air Act and 2) there were controls available to reduce those dangerous emissions. So there was no need for the EPA to consider costs to make its initial decision to regulate, but it promised to consider costs when adopting the actual final regulations for power plants.

Page 28 of 53

Powered by WordPress & Theme by Anders Norén