University of Calgary Faculty of Law ABLawg.ca logo over mountains

Will the Flurry of New Wind Energy Projects Face a Storm of Opposition?

By: Jeremy Barretto

PDF Version: Will the Flurry of New Wind Energy Projects Face a Storm of Opposition?

Decision Commented On: AUC Decision 3329-D01-2016, E.ON Climate & Renewables Canada Ltd., Applications for the Construction and Operation of the Grizzly Bear Creek Wind Power Project, May 19, 2016.

According to Alberta’s Climate Leadership Plan, renewable sources are expected to account for up to 30% of the province’s electricity generation by 2030—approximately triple today’s renewable generation. The provincial government is developing a competitive process to bring new renewable generation capacity to the grid, based on reports from an expert panel and the Alberta Electric System Operator. The first competition will be in Q4 2016.

As I’ve previously written, wind projects will likely obtain most government financial incentives, provided that such incentives are offered through a competitive auction for utility-scale renewable energy projects. That’s because upfront costs for wind energy projects are typically lower than other forms of renewable energy. The rapid development of wind energy in Ontario and recent Alberta decisions foreshadow potential vigorous opposition, and key process differences, for the anticipated flurry of new wind energy projects.

The Probative Value of Technological Evidence

By: Lisa Silver

PDF Version: The Probative Value of Technological Evidence

Case Commented On: R v Didechko, 2016 ABQB 376 (CanLII)

“After a while circumstantial evidence can be overwhelming!” remarked Mister Justice Germain in the recent Alberta Queen’s Bench decision, R v Didechko, (2016 ABQB 376, para 86). In this case, Justice Germain infers guilt on charges of failing to report an accident where death ensues pursuant to s. 252(1.3) and obstruct justice pursuant to s. 139(2) from the circumstantial technological evidence advanced by the Crown prosecutor. The use of such technological evidence, global positioning or GPS and telecommunications cell tower usage, is not unique. Rather what is singular is the evidential purpose for which it is proffered by the Crown as the only evidence available to establish the required factual connection between the accused and the crime. This case is a portent of the future as technological advancements make it possible, and necessary, to use such technological evidence for the investigation and successful prosecution of crime. Didechko is a persuasive example of a “smart” prosecution wherein the Crown utilizes all the evidentiary tools available to create a cohesive and, ultimately, unassailable prosecution. It is also a wake-up call for all those in the legal system to be mindful of the potential effects of technological advances in building a legally cogent case.

Justice In a Timely Manner: The New Framework for Trial Within a Reasonable Time

By: Drew Yewchuk 

PDF Version: Justice In a Timely Manner: The New Framework for Trial Within a Reasonable Time

Cases Commented On: R v Jordan, 2016 SCC 27 (CanLII); R v Williamson, 2016 SCC 28 (CanLII)

I recently posted a comment on a Supreme Court of Canada decision, R v Vassell, 2016 SCC 26 (CanLII), involving section 11(b) of the Charter, which guarantees the right of any person charged with an offence to be tried within a reasonable time. On July 8, 2016, the Supreme Court of Canada decided two more appeals on section 11(b) of the Charter. In a five-four split in R v Jordan, 2016 SCC 27 (CanLII), the majority overturned the framework for calculating unreasonable delay that was established in R v Morin, [1992] 1 SCR 771 (CanLII). The new framework is simpler, and establishes presumptive ceilings for unreasonable delay (minus defence delays) between charges being laid and the end of trial. The new ceilings are 18 months for charges going to trial in provincial court, and 30 months for charges going to superior court. (Jordan, at para 49) This is a significant change to section 11(b) jurisprudence, and both the majority and concurring judgments acknowledge it as such (Jordan, majority at paras 134-137, concurring at para 302). Moreover, the concurring justices only concur as to the outcome of Jordan – they propose a less radical departure from Morin and fundamentally disagree regarding the proper framework to be applied. This post explores the reasons provided by the majority for this change, as well as the application of the majority and alternative frameworks in Jordan and the companion case of R v Williamson, 2016 SCC 28 (CanLII).

The Standard of Patent Unreasonableness Lives On

By: Shaun Fluker

PDF Version: The Standard of Patent Unreasonableness Lives On

Case Commented On: British Columbia (Workers’ Compensation Appeal Tribunal) v Fraser Health Authority, 2016 SCC 25 (CanLII)

In its recent British Columbia (Workers’ Compensation Appeal Tribunal) v Fraser Health Authority, 2016 SCC 25 decision, the Supreme Court of Canada engages in a review of a tribunal decision which emanates from British Columbia. From the perspective of administrative law jurisprudence, what is noteworthy about this decision is that the Supreme Court applies the standard of patent unreasonableness in its review. Yes that’s right – this is the same standard of review which was shown the door by the Supremes in Dunsmuir. This decision reminds us that the standard of patent unreasonableness lives on in judicial review where a legislature has preserved it under a statute, as is the case in British Columbia with sections 58 and 59 of the Administrative Tribunals Act, SBC 2004 c 45, but offers nothing explicit on how this fits into general principles of administrative law.

Knock-for-Knock Decision Affirmed by Court of Queen’s Bench

By: Nigel Bankes

PDF Version: Knock-for-Knock Decision Affirmed by Court of Queen’s Bench

Case Commented On: Precision Drilling Canada Limited Partnership v Yangarra Resources Ltd, 2016 ABQB 365 (CanLII)

This matter, involving the interpretation of a standard form drilling contract, originally came on before Master Prowse as an application for summary judgement by Precision, the drilling contractor. My post on the Master Prowse’ decision, 2015 ABQB 433, is here and my post on Master Prowse’s further judgement, 2015 ABQB 649, on the “interest clause as penalty” issue is here. Both decisions favoured Precision, and Yangarra appealed both. In this decision Justice E.C. Wilson dismissed both appeals and affirmed Master Prowse’s decisions largely by quoting extensively from the learned Master’s reasons.